Bugis Village Hotel – Replacement of Timber Decking @ L5

Bugis Village Hotel Timber Decking Replacement (L5)

Bugis Village Hotel – Replacement of Timber Decking @ L5

Replacement of Timber Decking @ L5

We executed a comprehensive poolside decking replacement, beginning with the removal of weathered timber and a full structural assessment of the sub-frame. The new installation features high-density, weather-resistant hardwood secured with concealed stainless steel fasteners for a seamless, splinter-free finish. To ensure longevity, we optimized the under-deck drainage and airflow system, finishing the surface with a premium UV-stable, anti-slip coating for maximum durability against pool chemicals and sun exposure.

Date: June 19, 2025

Date
January 26, 2026
Category
Ample Projects
Tags
Follow Us